Coordination

The Space Every Service Has to Share

What a single ceiling can tell us about coordinating an entire building.

On an architectural drawing, a corridor ceiling looks like a line. Above that line, mechanical ducts, hydraulic pipework, sprinkler pipes, electrical cabling and communications trays all need a route. Below it, lights, air grilles, detectors and sprinkler heads have to fit into a layout that makes sense. Someone also needs to be able to get back in to service the equipment once the ceiling is closed.

1One ceiling, many claims on it

Say a duct needs to cross a drainage pipe where the structure already limits the space available. Moving the pipe may affect the fall it needs to drain. Moving the duct may shift a grille or put a damper beyond reach of its access panel. Lowering the ceiling may solve the immediate clash, but it changes the corridor the architect designed. The best option depends on what each service needs to do and what the building needs to deliver.

2Coordination starts before the clash

A shared BIM model can show where two services occupy the same space. The bigger decisions start earlier, when the team is still working out where plant rooms and risers go, how services cross the building and where people will need access to maintain them. Reserving that space early gives each discipline a workable route and gives the architect a clearer picture of what can fit.

3The payoff comes later

The payoff shows up during installation and long after handover. The installer has room to make the connection. The ceiling can sit where it was intended. And when a technician comes back years later, the equipment they need to reach is still accessible.

What good coordination looks like

Reserve space early

Decide where plant rooms, risers and service routes go, before floor plans and ceilings lock in.

Design routes, not just clashes

A shared BIM model finds overlaps, but the bigger wins come from planning how services cross the whole building.

Keep ceilings serviceable

Grilles, dampers and access panels should stay reachable — years after the ceiling is closed.

Coordinating a project? Haron Robson, now powered by BESTEC, can help coordinate building services while there is still flexibility in the design.

Enquire Now Enquire Now

Subscribe to our Newsletter

Signup for our monthly newsletter to get the latest news, updates and amazing offers delivered directly in your inbox.